Registration Closes February 28
Registration is now closed
Low Life Barrel House, 398 Daly St N, Winnipeg, MB
5:00 – 6:00 pm – Pizza and Beverages
6:00 – 6:15 pm – Welcome & CDA Introduction
6:15 – 7:00 pm – Presentation #1 - Slave Falls Sluiceway Life Extension 2020-2025
7:00 – 7:45 pm – Presentation #2 - Rehabilitation of the Rivers Dam Low-Level Outlet
Networking to follow
Synopsis: After investigations into the structure triggered a Dam Safety Emergency in 2018, the Slave Falls 7-Bay Sluiceway has been the subject of extensive investigation, analysis, and rehabilitation work. This presentation will explore the work that has occurred to date and outline plans for future construction to extend the life of the structure and ensure its continued safe operation
Synopsis: The Rivers Dam was constructed in 1959 by the Prairie Farm Rehabilitation Administration (PFRA) and is located on the Little Saskatchewan River, east of the Town of Rivers in the R.M. of Riverdale, Manitoba. Following the record flow in the 2020 flood, MTI commissioned KGS Group to design and implement both interim repairs and permanent rehabilitation measures for the dam, as well as, the spillway and low-level outlet. This presentation will focus on the degraded condition of the over 60 year old low-level outlet structure, the design rehabilitation of the gate, concrete conduit and stilling basin, as well as the construction.